Payment plan request

Get your payment plan

Check what you picked and tell us where to reach you. We confirm the price and send your financing options together with your estimate.We confirm the price and send your financing options together with your estimate.

Plan length ≈ $317/mo · 0% APR*≈ $317/mo · 0% APR*

What do you need?

We come out, check your space and give you a written price. Estimates for new systems and replacements are free.We come out, check your space and give you a written price. Estimates for new systems are free.

Where can we reach you?

No obligation. Checking your financing options won’t affect your credit score.No obligation · won’t affect your credit

*All financing is subject to credit approval. Your terms may vary. Payment options through Wisetack are provided by our lending partners. For example, a $5,500 purchase could cost $253.54 per month for 24 months, based on a 9.9% APR, or $1,833.33 per month for 3 months, based on a 0% APR. Offers range from 0 to 35.9% APR based on amount requested and creditworthiness. Not all merchants and lending partners participate in 0% interest programs. Terms range from 3 - 120 months and may vary based on merchant, lending partner, or transaction size. State interest rate caps may apply. No prepaid finance charges or participation fees. See additional terms at wisetack.com/faqs.

ART HVAC offers financing on jobs from $500 to $25,000. Payments shown are estimates for illustration, not an offer of credit.

VRF and VRV Systems in Manhattan: Installation, Replacement and Service

A VRF system (Daikin's name for it is VRV) heats and cools a whole floor or a whole house room by room, from one set of condensing units and a network of copper refrigerant lines. We handle VRF installation, replacement and service in Manhattan offices, shops and restaurants, medical suites, townhouses and large apartments. In this borough the design starts with three questions: where the condensing units can sit, how much refrigerant the smallest room can take, and who has to sign off.

Two rows of Daikin VRV condensing units on steel rails along a flat roof, bundles of black-insulated refrigerant lines running off on supports, a brick wall and an apartment tower beyond
Daikin VRV condensing units on roof rails, their refrigerant lines on supports beside them.
  • VRV/VRF system, 3–8 zones: $15,000–$45,000
  • Larger systems: quoted per project
  • Free installation estimates
  • Daikin, LG and Mitsubishi systems serviced

Which VRF Setup Fits Your Manhattan Space

Think of VRF as a kit with interchangeable parts. The same condensing units can feed ceiling cassettes, units hidden above a ceiling, wall units or units tucked into a window cabinet. What changes from space to space is which parts you choose, whether the system has to heat and cool at the same time, and where the outdoor side lives. Pick the space closest to yours.

An office floor or a full office suite

Rooms on an office floor rarely agree. A corner office collects the afternoon sun, a conference room fills up at ten, and the server closet runs warm in January. A heat recovery VRF can cool some rooms while it heats others, moving the heat it pulls out of the warm rooms into the ones that need it, much as your refrigerator moves heat out of the food and into the kitchen.

Heat pump or heat recovery
Heat recovery when some rooms want heat while others want cooling; a heat pump system when the whole floor wants the same mode at the same time.
Indoor units
Ceiling cassettes in open areas, ducted units above the ceiling for private offices, a wall unit for the server closet.
Condensing units
On the roof, on steel rails or dunnage. In a building with a condenser water loop, a water-cooled VRF can sit indoors and reject its heat into that loop.
Who signs off
Your landlord, under the lease; the DOB, through the filing.
Watch for
Building air that stops at night. A landlord only has to run the building-wide system during the hours in your lease, so a server room or late hours may call for a system of your own.

From our jobs In Midtown West, a Mitsubishi VRF system with four outdoor units, ducted and wall-mounted indoor units and a ventilation unit gets our maintenance twice a year.

How heat recovery works

Every option starts with a load calculation, room by room. ART HVAC is an official Daikin partner, and we also service LG and Mitsubishi systems; Daikin's VRV lines and indoor unit styles are on our Daikin page.

The Refrigerant Check Behind Every VRF Design

A VRF system is one long refrigerant circuit with branches into many rooms. That is its strength, and it is also why the city's Mechanical Code caps how much refrigerant one circuit may hold: if a pipe or a coil leaks, the refrigerant can collect in whichever room it reaches. So before anyone picks indoor units, we check each circuit against the smallest room it serves.

R‑410A systems: the smallest‑room rule

For R‑410A, the code's limit is 26 pounds of refrigerant per 1,000 cubic feet, counted in the smallest enclosed room the circuit serves. Take a 10‑by‑12‑foot office with a 9‑foot ceiling: 1,080 cubic feet, or about 28 pounds for the entire circuit, every foot of piping included, not just the unit in that room. Rooms joined by permanent openings count as one space, and a ceiling plenum that carries return air adds to the room's volume. A door doesn't count, because it can be shut.

R‑32 and R‑454B systems: the rules since May 15, 2026

New VRF lines are moving to A2L refrigerants such as R‑32, and for those the Department of Buildings adopted rules that took effect on May 15, 2026 and bring in the ASHRAE 15 standard. The allowed charge is worked out room by room. Where the standard calls for it, the system needs its own refrigerant detectors and automatic responses, such as safety shutoff valves that close off a leaking branch. Two details matter in a building with corridors and many floors: the calculation also covers rooms the piping only passes through, and A2L piping may run through a building's public corridors only inside a second pipe and a two‑hour fire‑rated enclosure. The pressure test is witnessed by a special inspector.

Can a new system still use R‑410A?

For the most part, no. New York's Part 494 bars new VRF systems on refrigerants with a global warming potential over 700, which rules out R‑410A, from January 1, 2026. The state then let R‑410A systems that Daikin, LG, Mitsubishi Electric and Samsung listed in a joint variance be installed until January 1, 2027, and the federal rule ends installs of R‑410A VRF systems built from parts made before 2026 on that same date.

R‑410A or A2L: what changes for a VRF project in the city
R‑410A (Group A1)R‑32 or R‑454B (Group A2L)
New installs in New YorkOnly systems covered by the state variance, until January 1, 2027Allowed
Charge limit per circuit26 lb per 1,000 cu ft of the smallest roomWorked out room by room under ASHRAE 15
DOB permit exemptionSystems up to 25 tonsNot covered
Pressure test after installationRequiredRequired, witnessed by a special inspector
Sources: NYC Mechanical Code Table 1103.1 and Sections 1104.4 and 1108.1; 1 RCNY 7011‑01; 1 RCNY 101‑14; 6 NYCRR Part 494 and DEC’s variance letter of November 14, 2025.

Existing R‑410A systems can keep running and be repaired; the bans apply to new systems. Replacing enough of a system can make it count as new under the state rule, though, so a big replacement should be planned for an A2L refrigerant from the start.

Insulated refrigerant lines branching off a black-insulated header hung on strut under a concrete slab, cast-iron drain pipes beside them
Refrigerant lines branching off a header under a concrete slab.

From Walk-Through to Startup: A Manhattan VRF Project, Step by Step

A VRF job touches the roof, every room it serves and the paperwork of at least one building. Here is the usual order, and who does each part.

  1. Walk-through, load calculation and the refrigerant check

    ART HVAC

    We walk each room, the roof and the electrical room, and read the lease or alteration agreement, since it decides what you may add. The load calculation sizes every room for its sun, people and equipment; then each circuit is checked against the smallest room it serves, and one that comes out too big gets split or gets the detectors and shutoff valves the A2L rules allow for.

  2. Drawings and spec sheets for the building

    ART HVAC prepares them; the landlord or board reviews

    The package shows the roof or terrace layout with the steel the units stand on, the piping route floor by floor, and each unit's sound rating. The Noise Code allows 42 dB(A) for one unit and 45 dB(A) for all of them together, measured 3 feet from a neighbor's open window, so on a roof with several modules the total is what we design to. When the managing agent asks, we send a certificate of insurance naming the building.

  3. Landmarks, if the building is protected

    You or your architect apply; we prepare the drawings and spec sheets

    In a landmarked building or a historic district, rooftop units need a Landmarks Preservation Commission permit. Staff can approve units that can't be seen from the street, and minimally visible ones when hiding them isn't possible. Expect a sightline drawing taken at eye level from across the street, steel and parapet included, and possibly a full‑size mock‑up on the roof.

  4. DOB filings

    ART HVAC handles the DOB filing; a licensed master electrician files the electrical permit

    A VRF on R‑32 or R‑454B falls outside the DOB's permit exemption for small refrigerating systems, which covers only Group A1 refrigerants such as R‑410A, and only up to 25 tons. New steel on the roof is structural work and new circuits are electrical work, and each has its own filing even where the mechanical side would be exempt.

  5. Rigging day

    Rigging crew, then ART HVAC

    Condensing units go up by crane, or by hoist or freight elevator when the units and the building allow it. A crane standing on a Manhattan street needs a DOT permit, the job generally needs a crane notice filed with the DOB, and the lift is booked with the building.

  6. Piping, pressure test and commissioning

    ART HVAC; on A2L systems a special inspector witnesses the test

    We braze the piping, hold it under nitrogen pressure and pull a deep vacuum before any refrigerant goes in. Then every indoor unit is addressed and run in both modes, the charge is set to the manufacturer's figure, the controls are programmed zone by zone, your staff learn the system, and we register the manufacturer warranty. Our price list puts a 3 to 8 zone install at 3 to 10 days.

  7. A service plan from the first season

    ART HVAC

    A VRF system keeps its own history of fault codes, and our diagnostics start there. Our VRF maintenance agreements in the borough run twice a year, before the cooling season and before the heating season. Every maintenance visit ends with a written condition report.

VRF System Costs in Manhattan and What Drives Them

Our NYC price list has one VRF line, for systems of 3 to 8 zones. Anything bigger is priced from its own drawings, and so is work on a system that is already in place, because no two buildings route their piping the same way.

VRV/VRF system, 3 to 8 zones
$15,000–$45,000
Condensing unit, indoor units, piping, central controller, electrical, commissioning, staff training and warranty registration.
Larger systems and whole floors
Quoted per project
From the load calculation and the drawings.
Repairs, diagnostics and maintenance agreements
Quoted on site
Priced in writing before any work.

What moves the price here

Getting the units up
A crane on the street, with its permits, costs more than a hoist or the freight elevator.
Steel on the roof
New rails or dunnage, and the structural filing that comes with them.
The piping route
How many floors and feet lie between the roof and the indoor units, the shafts available, and the sleeved, fire‑rated runs A2L piping needs in public corridors.
Heat recovery
Branch boxes and a three‑pipe layout cost more than a heat pump system.
Indoor unit types
Concealed ducted units bring ductwork and access panels; cassettes and wall units are simpler to fit.
Your building’s schedule
Night or weekend work and freight elevator bookings stretch the job and its labor.

Installation estimates are free. We look at the space, the roof and the electrical room, then send a written, itemized estimate. Repairs on an existing VRF system are quoted on site, before any work; residential repair ranges are on our price list.

Con Edison incentives. Con Edison's commercial program pays customers who move a building's heating to electricity, and VRF heat pumps count, in existing buildings and gut rehabs but not in new construction. The work goes through a contractor on Con Edison's participating list, and apartment buildings with five or more units have a separate multifamily program. We walk you through the incentives your project may qualify for.

Local Law 97. Buildings over 25,000 gross square feet have emissions limits that started in 2024 and get stricter in 2030. If yours is one of them, ask the owner or the building’s energy consultant how a VRF project counts toward those numbers before the design is final.

VRF Jobs Across Manhattan, From East Harlem to Tribeca

VRF and VRV systems our crew has worked on around the borough: diagnostics by fault code, control board, compressor and fan motor replacements, leak searches and maintenance agreements. Each line names the brand and what was done.

Four Toshiba Carrier VRF outdoor units on steel stands on a flat roof, plywood sheets laid over the roofing, a brick parapet and brick apartment towers beyond
Toshiba Carrier VRF outdoor units on roof stands
A Daikin VRV unit standing in a room with concrete block walls, a sheet-metal duct connected to its top and more ductwork overhead, coiled wire on the floor
A Daikin VRV unit indoors, ductwork connected to its top
Three side-discharge outdoor units hung on brackets along a concrete wall, service panels open on two of them, pipes and conduit overhead, boxes on the floor
Side‑discharge units on wall brackets, two with panels open

Uptown

  1. East Harlem

    • Daikin VRV heat pump system, 5 tons: main outdoor control board replaced, programmed and tested
    • Daikin VRV: outdoor fan motor replaced, heating and cooling checked
  2. Upper West Side

    • LG VRF in an apartment: maintenance and deep cleaning of six concealed floor‑standing indoor units and their condensate pumps, one pump replaced
    • LG VRF with four indoor units: leak search found two evaporator coils leaking beyond repair in place; replacement recommended
    • LG VRF: worn refrigerant line insulation replaced inside an indoor unit, condensate pump cleaned, an overcharge corrected to the manufacturer’s figure
  3. Midtown West

    • Mitsubishi VRF system with four outdoor units, ducted and wall‑mounted indoor units and a ventilation unit: maintenance twice a year
    • Mitsubishi City Multi: compressor and inverter board replaced
  4. Midtown East

    • LG VRF system: refrigerant leak found and repaired, then pressure‑tested, evacuated, recharged and restarted
  5. East Village

    • LG VRF system diagnostic: stored fault codes, communication between units, pressures and temperatures, with written findings
  6. Tribeca

    • LG VRF with three indoor units: a CH03 communication fault traced to one indoor unit’s control board by swapping controllers
    • LG VRF system: main control board and power supply board replaced
    • Mitsubishi City Multi, 5 tons: main control board replaced
    • Mitsubishi City Multi with 13 ceiling cassettes: maintenance visits under an agreement

Downtown

Clients on VRF Repairs and Building Calls

All reviews on Google
★★★★★

We had an ongoing issue with our LG VRF system that other technicians were unable to properly diagnose or repair. ART HVAC was called in, and their technician quickly identified a problem with the control board using professional diagnostic tools and specialized software. After the replacement part arrived, the system was restarted and another issue was discovered during commissioning. The team continued troubleshooting until the entire system was fully operational. The VRF system is now running perfectly in all modes. Professional approach, strong technical knowledge, and persistence in solving complicated problems. Highly recommended

Назар Гринів Google · May 2026
★★★★★

The technician was a great communicator about time to the building and the required fix. Would book with him again if there are any other AC issues.

Joel F. Thumbtack · Sep 2023

VRF Questions From Manhattan Tenants, Owners and Managers

Our office building turns the air off at 6 p.m. Can we add our own VRF system?

Usually it comes down to the landlord's consent. A landlord only has to run the building‑wide heating and cooling during the hours your lease lists, so a tenant with a server room or late hours may need a system that serves its space alone. Expect that system to be yours: the city's commercial leasing guide notes that a tenant will likely have to repair, maintain and replace a unit that serves only its space. Settle roof rights, the piping route and electrical capacity with the landlord first.

Do we need a DOB permit for a VRF system in Manhattan?

For a new system on R‑32 or R‑454B, yes. The DOB's permit exemption for small refrigerating systems covers only Group A1 refrigerants such as R‑410A, and only up to 25 tons. Either way, new steel on the roof and new electrical circuits have their own filings, and a landmarked building also needs a Landmarks Preservation Commission permit. We handle the DOB filing; the electrical permit is filed by a licensed master electrician.

Can a new VRF system still use R‑410A in New York?

Only in narrow cases, and not for long. New York's Part 494 bars new VRF systems on refrigerants with a global warming potential above 700 from January 1, 2026. A state variance lets R‑410A systems that four manufacturers listed be installed until January 1, 2027, and the federal rule allows R‑410A VRF systems built from parts made before 2026 until the same date. A project designed now should plan for an A2L refrigerant such as R‑32.

Our VRF runs on R‑410A. Can we keep repairing it?

Yes. The bans cover new systems, and servicing with R‑410A is still allowed. Two cautions. Replacing enough of a system can make it count as new under the state rule, so a large replacement should be planned around the new limits. And in a commercial building, a circuit that holds 50 pounds of refrigerant or more falls under New York's Refrigerant Management Program: regular leak inspections, and a leak repaired within 14 days, or 45 if a technician or parts aren't available.

How loud will the condensing units be for our neighbors?

The city's Noise Code limits one unit to 42 dB(A) and all of them together to 45 dB(A), measured inside the neighbor's property 3 feet from an open window. On a roof with several VRF modules, the combined limit is the one that matters. Placement does most of the work: away from bedroom windows, behind a parapet or barrier, on rails or curbs that keep vibration out of the roof, and with quieter models where the margin is tight.

We are replacing an old VRF with an R‑32 system. Can the old piping stay?

Sometimes. Daikin says its R‑32 VRV EMERION has a field setting that lets it reuse an existing R‑410A piping network, which matters when the pipes run behind finished walls. The city's A2L rules still apply to that piping: the refrigerant calculation covers rooms the pipes pass through, and piping in public corridors needs a second pipe and a two‑hour fire‑rated enclosure. We check the route, the pipe sizes and the insulation before counting on it.

How often should a VRF system be serviced?

Our VRF maintenance agreements run twice a year, before the cooling season and before the heating season. A visit covers the indoor units (filters, coils, drain pans and condensate pumps), the outdoor units (coils, fans, electrical connections and operating pressures) and the fault code history. Every maintenance visit ends with a written condition report. Repairs the visit turns up are priced before any work.

Does Con Edison offer incentives for VRF in an office building?

Con Edison's commercial program covers VRF heat pumps that take over heating in existing buildings and gut rehabs, but not in new construction, and the incentive goes through a contractor on Con Edison's participating list. Apartment buildings with five or more units have their own multifamily program. We can walk you through what your project may qualify for.

Planning a VRF System, or Keeping an Old One Running?

For a new system, send the floor plan, the lease or alteration agreement if you have it, and photos of the roof. For an existing one, the brand and the fault code on the controller tell us most of what to bring.

Book Now