Brownstones and rowhouses
Park Slope, Bed-Stuy, Fort Greene, Carroll Gardens and Crown Heights have blocks of three- and four-story rowhouses, typically heated by radiators and built without ducts. The usual plan is a multi-zone system: a wall unit on each floor, sometimes a slim ducted unit in a closet ceiling for the top-floor bedrooms, and one or two outdoor units in the yard or on the roof. The lines run inside closets or up the back wall, so the parlor floor keeps its moldings.
Sort out first: whether the boiler keeps heating the house or the mini-splits take over, and whether your block sits in a historic district.
Two-family houses
Owner on one floor, tenant on the other: give each apartment its own system, with its own outdoor unit and power from that apartment's own panel and meter. One shared multi-zone system would put all of its electricity on one Con Edison bill. Clean Heat incentives are counted per apartment, too (see the FAQ).
Detached and semi-detached houses near the water
In Marine Park, Mill Basin, Gerritsen Beach, Sheepshead Bay, Manhattan Beach and Midwood you find detached and semi-detached houses with side yards, some with ducts already in the attic or basement. Wall units suit the rooms that need them; for a whole house with sound ducts, a ducted system can be the better buy. See heat pump installation in Brooklyn.
Sort out first: the flood map. Sandy's surge flooded all of Gerritsen Beach, and City Planning has since studied Gerritsen Beach, Sheepshead Bay and Canarsie as floodplain neighborhoods. In a mapped flood zone the outdoor unit goes up, not down, so check your address on the NYC Flood Hazard Mapper first.
Co-ops and condos
Pre-war co-ops along Ocean Parkway and in Brooklyn Heights, newer condos by the water: here the building decides. Expect an alteration agreement, a board review and house rules on outdoor units, and nothing on the fire escape. We prepare the spec sheets with sound ratings, a drawing of the unit and line route, and a certificate of insurance naming the building. The board process is laid out on our Manhattan mini-split page.